The Nails in the New Sheathing Were Already Rusting
I was in Seekonk for a phase inspection on a house still under construction. The foundation was poured, the basement was in, the first floor was framed, and the crew had started on the second floor platform. ZIP System sheathing covered most of the first floor exterior walls, but the work was not finished. The window openings were not covered or sealed, and the framing had been open to the weather for a long time.
The nails were overdriven in many areas across the sheathing that was already on the walls. Some spots also carried far more nails than the panel needed, and plenty of those were overdriven too.
Water was getting in around the nail penetrations. Rust was showing at many of the heads. A lot of the seams had not been taped, and at the untaped butt joints the panel edges were opening up, swelling and taking on water. From inside the basement I could see daylight through untaped joints.

Sheathing does more than keep weather out. Nailed to the framing, it braces the walls against racking from wind and other side loads, and that bracing depends on each nail head bearing on the face of the panel. An overdriven head breaks through that face and holds less, and closely crowded nails can split the panel around them. Overdriven nails reduce the strength of the sheathing board, by up to 25 percent where this much of it is overdriven. Each sunken or crowded penetration is also a path for water into the panel, which is what was happening here.
The fix is not complicated. Have the overdriven nailing repaired per the structural engineer's specifications, with new nails driven flush, and do it while the walls are open and somebody can still look at every panel.
My primary concern on this house is the continued exposure of the building and the materials to the weather. Some of that is unavoidable while a house is going up. Reasonable measures still have to be taken to protect the structure as the work moves along, and the time to deal with any of it is while the framing is open and accessible. Once the next stage covers these walls, nobody is looking at these nails again.